HS2 Public Information Events

HS2 Public Information event at Oulton Institute
12 noon to 5pm Saturday 15 September 2017

This is your chance to drop in and examine their latest plans for our area and the proposed depot near Arla.

Make the most of this opportunity to express your views on their plans!

Demand more and longer tunnels, instead of the huge viaducts, to remove the blight to our valley. If they tunnel both the Leeds branch line and main line from the M62 it would avoid all the destruction and protect our green setting.

SOWHAT will also be available at the Institute (in the Committee room, first left inside the front door) all afternoon and have arranged for the following representatives to be present:

Karen Bruce (Labour Cllr) 12-2pm
Kieth Wakefield (LCC) 12-1pm
Andrew Hall (LCC) 12-2pm (Head of Transportation)
Dylan Brown (Green Party) From 12 noon

Oulton & Woodlesford Neighbourhood Forum will also be in attendance.

Have your say before it’s too late!

Update for those that missed the above event:

The current HS2 proposed route will destroy our area. Don’t let this happen. There are better alternatives. HS2 must tunnel the entire section through LS26 on both the branch and main lines. Go have your say. Find out about the consultations and send them your written objections.

Tuesday 19 September, 2pm to 8pm
Thorpe Park Hotel & Spa, 1150 Century Way, Leeds, LS15 8ZB

Wednesday 20 September, 2pm to 8pm
Thwaite Mills Watermill, Thwaite Lane, Leeds, LS10 1RP